Post-construction inspection survey

The purpose of surveying is to fix and document the position and technical characteristics of the building or its part. The scope of the work, scales, digital data output formats and special requirements are determined in the source task of the customer of geodetic research and surveying. If the customer does not submit special requirements, the work will be performed according to standard requirements. We provide the customer with the execution drawings in the agreed volume and form, both on paper and digitally.

It is especially important to survey the underground utility networks before driving the trenches. Otherwise, it will not be possible to accurately determine the position of utility networks later. However, this is the main cause of later accidents.

Construction measurement is definitely carried out:  in the construction of heating lines, in the construction of gas lines, in the construction of communication lines, in the construction of electric lines, in the construction of roads and squares, in the construction of foundations.